Special edition devoted to accelerate the pace of restructuring and the issue of the quality of construction and other works at the enterprises of the Krasnoyarsk Territory.
In the streets of the hot water.
The slogan on the house.
The queue at the store.
Craft Association "Khimvolokno".
Works Commission gospriemka.
Members of the commission and N.Korenko G.Verhushina.
Reels with threads.
Tells N.Korenko.
The workers at the bench.
Alternation: by moving the stand column with the finished product, says L.Chernikova.
Factory laboratory.
Says the head of Z.Bykova.
state acceptance commission on the shop floor.
Stand with the finished product.
Working Minusinskogo Electrocomplex go to the factory.
Entrance of the plant.
Workers in the hallway.
Says the head of V.P.Shapovalov.
Machine CM-600 CNC. plasma cutting machine.
Workshop on production of vacuum circuit breakers.
Alternation: V.P.Shapovalov, enterprise products.
They say the chief designer and engineer V. Rybakou M.Moskvin.
The unfinished building of the plant.
Types of Sayanogorsk.
Alternation: tell design engineers and T.Petropavlovskaya S.Fedotova parents walk with their children.
Alternation: says deputy governor for the construction V.Belousov, buildings under construction.
Children ride on the carousel.
Women with prams.
A nurse with a baby in her arms.
Children in the hospital.
Multi-storey residential building.
Woman with child at the window.
Locations: Krasnoyarsk Territory [762]
Seasons: Winter [823]