Port of Arkhangelsk.
Vessel under construction in dry dock - different plans.
The ship at the pier.
Interview of Deputy General Director for Production Vladimir Stefan.
Work on the construction of the ship - different plans.
Calendar: 1996
Locations: Arkhangelsk, Russia