Safety in the construction of subgrade (1971)

Documentary №41110, 2 parts, duration: 0:10:00
Production: Sverdlovsk newsreel studio
Director:A.Leonidov
Screenwriters:N.Salamanov
Camera operators:R.Anisimov, R.Dolnikov

Reel №1

Footage frameFootage frameFootage frameFootage frame

The excavator loads the dump truck with earth.

The work of a bulldozer.

Forest (shooting from a helicopter).

Instructing workers before the start of clearing the route.

Felling of the forest.

Removal of wood from the cutting area.

The work of the machine for uprooting stumps.

Blasting operations.

Construction of the second railway track.

The signalman gives a sound signal about the approach of the train.

A passing train.

Safety instructions at the excavation site.

Checking the equipment before starting work.

Seasons: Summer [824]

Reel №2

-

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.