Maintenance bulldozers DZ-132-T and RS-126B-2 (1988)

Documentary №41123, 3 parts, duration: 0:28:54
Production: Sverdlovsk newsreel studio
Director:E.Tareev
Screenwriters:Lipatnikov
Camera operators:Yevrilov
Composers:Vizel

Annotation:

The film shows the methods of servicing bulldozers.

Reel №1

Footage frameFootage frameFootage frameFootage frame

The work of a bulldozer.

Streets and squares of Chelyabinsk.

The checkpoint of the Chelyabinsk Road Machinery Plant.

Finished products of the plant.

Testing of the bulldozer.

Field tests.

Lifting and lowering the blade.

Another modification of the bulldozer with mounted ripping equipment.

The ripper is in operation.

Cleaning the bulldozer from dust and soil.

Outdoor car wash.

Daily maintenance of the bulldozer.

Topping up the coolant.

Checking the oil level.

Checking bolted connections of attachments.

Key words

bulldozer

Locations: Chelyabinsk [885]

Seasons: Summer [824]

Reel №2

Footage frameFootage frameFootage frameFootage frame

First maintenance:

The fuel system is drained of sludge.

The centrifuge of the engine oil filter is flushed.

Prevention of electric transmission machines.

Checking the brushes.

Cleaning of batteries from dust and dirt.

Checking the electrolyte level.

Checking the wires.

Checking the readiness of the attachments for operation.

The bulldozer is in operation.

Second maintenance.

Oil change.

Refueling of oil in guide wheels, support rollers and support rollers.

Lube.

Flushing of hydraulic drive filters.

Locations: Chelyabinsk [885]

Reel №3

Footage frameFootage frameFootage frameFootage frame

Measure the density of the electrolyte in each battery.

Preventive maintenance of control and start-up devices and resistance panels.

Lubrication of hinge and screw connections.

Third maintenance.

Disassembly of glasses with filtering elements and washing in diesel fuel.

Replacement of lubrication in on-board gearboxes.

Cleaning of the nozzle and ejectors of the cooling system.

Flushing of the rear axle housing,the crankcase of the drive gearbox, the power generator.

Checking fuses and electrical equipment.

The bulldozer pulls into the garage.

Seasonal maintenance.

Preparing the car for winter.

Antifreeze filling.

Draining the liquid from the hydraulic cylinder.

Key words

Bulldozer

Our website uses "cookies" to give you the best, most relevant experience. By continuing to browse the site, you agree to our use of cookies. See our User Agreement, Privacy Policy and Cookies Policy.