The difficult situation at the South Ural railway in the early 1980s made the the line management staff take decisive measures in the sphere of the railway improvement.
Freight trains move by rail.
Scheme of the South Ural railway.
Congestion of trains at the station.
Laying of the railway track.
Road reconstruction works.
Formation of a long-composite train.
Station attendant.
The locomotive carries a long train.
Electronic telemechanical system of many units.
Connection of locomotives.
A train with two locomotives.
The driver in the cab of the locomotive.
Landscape outside the window of a moving train.
Objects:
South Ural Railway
Seasons: Summer [824]
Instrument readings.
The driver is in the cab.
Movement of a train with two locomotives (animation).
Zlatoust station.
A heavy, long-composite train is moving by rail.
Kropachevo station.
Kurgan branch of the South Ural Railway.
Connecting two trains.
Centralized control panel.
First Deputy Head of the South Ural Railway
M.A.Kokurkin (synchronously) on the results of the reconstruction of the railway.
The train goes over the bridge.
Locations: Ural [920]