The film is dedicated entirely new methods of organizing production in the engineering enterprise.
The film introduces a new method of organizing production in Kaluga Turbine Plant, which is based on the creation of integrated teams for the production of a set of parts of individual structural components of the turbine.
Showing communicating, industrial factory shop, meeting working team dedicated reception team in the new work (synchronously) and a production meeting at the head of the shop (synchronously).
Basic principles and the main idea of the new method are illustrated with the help of animation.
Key words
Engineering.
Locations: Kaluga region [779]
Brigade meeting (synchronously).
Production meeting at the head of the shop (synchronously).
Assembly shop.
Brigade meeting (synchronously).
The workshop of the plant.
The general director of the plant, V.V.Pryakhin, talks about the complex system by which the plant operates (synchronously).
Locations: Kaluga region [779]
Objects:
Kaluga Turbine Plant