On best practices and progressive technologies of maintenance of signalling systems and communications in the South-Western railway.
Moving freight train.
Darnitskaya distance.
Control room.
The scoreboard of the engineer on duty.
Dispatchers at work.
Oscilloscope readings.
Carrying out prevention.
Stress relief in places of work.
The brigade receives instructions before entering the line.
The brigade is on the line.
Installation of butt joints.
Technical cabinet of the distance.
Work on the simulator.
Mechanized sorting slide.
Control of rail circuits from the remote control.
Arrow translation.
The movement of the locomotive.
Testing of electric drives and control units on the stand.
Carriage decelerators.
Locations: Ukraine [229]
Repair of decelerators at the repair site.
Drilling device.
The use of pneumatic tools and means of small mechanization.
Compressor facilities.
The use of lifting mechanisms.
Automated elevator conveyor.
The receiving chamber of the pneumatic mail.
A device for assembling and disassembling the compressor.
Checking the instruments.
Replacement of devices and checking their operation.
Locations: Ukraine [229]
Seasons: Summer [824]