In the issue describes the construction of a gas pipeline "Central Asia - center" on the bottom of the Volga river near the town of Marx Saratov region.
The face of the bulldozer.
The view from the cockpit of a bulldozer.
Excavator for digging a trench for the gas pipeline "Central Asia - Center".
View of the Volga in the area of Marx Saratov region in the place of laying of the pipeline in August 1966.
Surveyor at work.
The work of drilling rigs.
The descent of a diver on the river bottom with a charge of TNT.
The bomber on the deck of the vessel receives the report from the diver about setting explosives.
The face of the shooter.
The explosion at the bottom of the Volga.
Laying of the pipeline in November 1966.
The welding seams of pipes.
Pipe connection thread of the gas pipeline.
The face of Ilyin, affordable system.
Ilin for work on the pipe connection.
A welder at work.
Welding the next seam.
Check the quality of welding seam with the aid of a special x-ray machine.
Installation parts protective cover of pipeline.
The welding process of the pipeline prior to installation on the bottom of the Volga.
Transportation filament welded pipeline to the river.
Feeding the pipeline with a crane, the crane bends under the weight of the cargo.
Rotates the winch on the other side.
The process of pulling the pipeline to the water and river bottom.
Dredges to the shore.
Drifting snow in the desert.
Types of town builders in the winter, the daily life of the builders of the pipeline.
One of the builders washes with snow.
Cooking Breakfast in the kitchen person chefs.
The builders of the pipeline have Breakfast and lunch in the dining room.
Woman hanging in the cold fresh linen.
The construction of the town.
The ship on the snowy shore.
Panorama of the threads of the pipeline on the frozen inlet channel.
Builders split the ice with crowbars.
The removal of the chipped ice taps.
Transportation pipeline and through the inlet channel, the work of machines and mechanisms.
Tracked vehicles stalled in the snow.
The training of the diver to dive.
Thawing a frozen valve on the helmet of the diver with boiling water.
A diver jumps into the hole.
The supervisor keeps in touch with the diver, taking his report.
Securing the tow rope.
Working warmed hands.
Supervisors served the team to continue pulling the threads of the pipeline after Troubleshooting.
The thread of the gas pipeline goes under the water.
Rotate the winch mechanisms.
View of a portion of the supply channel.
The output of the pipeline to the other side of the Volga.
Inspection arranged on the Bank of the pipeline.
The faces of the builders.
Calendar: 1967
Locations: Saratov region [801]
Seasons: Summer [824] Autumn [826] Winter [823]