The issue is dedicated to the working days of the advanced team of builders of "Astrakhanselstroy" under the leadership of M. B. Koblov.
Children in kindergarten draw a construction site.
The boy talks about his desire to become a Builder (synchronously).
View of the sleeping room in the kindergarten.
Foreman of the construction team of Astrakhanselstroy M. B. Koblov speaks about the participation of the team in the construction of a children's factory in the international year of the child (synchronously).
Bricklayers of the Koblov brigade are masonry.
Rough finishing of the erected brick walls.
The head of construction speaks about the work of the team under the leadership of Koblov, its achievements (synchronously).
Team members during a smoke break.
Koblov's face during the meeting.
View of a five-story residential building, Koblov talks about the introduction of the brigade system of brigade contract (synchronously).
Welder at work.
Construction of sections of a metal fence.
The masons are laying.
Panorama of the sleeping area of the children's factory.
Koblov talks about the types of work performed by members of his team (synchronously).
Installing a sheet of glass for cutting.
Welder at work.
Carrying out interior finishing works by members of the Koblov team.
Painting window frames.
Koblov speaks about the preliminary provision of construction work performed by members of the team, in order to avoid downtime (synchronously).
Laying of rail tracks for a tower crane.
The head of construction speaks about the work of Koblov on the construction site as a foreman and foreman (synchronously).
Koblov is on the phone.
The upgrade of concrete structures using a crane.
Type of tower crane.
Layout of a new residential block.
Architects during a meeting on the development of a new quarter.
Payment of wages to workers of the Koblov brigade, payroll statement.
The workers sign the receipt of wages.
Koblov tells what makes up the salary in his team, about receiving bonuses (synchronously).
Working teams of Koblov on the construction of the next object.
Panorama of the construction of one of the objects.
Brigadier Y. Kulikov talks about his work in the Koblov brigade, the experience gained, and the creation of a new self-supporting team (synchronously).
Builders at work.
Chief engineer of "Astrakhanselstroy" B. p.
Ogurtsov speaks about the existing procedure for planning capital construction, as one of the problems that hinder the implementation of a team contract, the low amount of capital investment, the hope for better planning and reduction of small teams and the introduction of self-financing in enlarged teams (synchronously).
Workers paint the figured gate lattice of the kindergarten "Skazka".
Washing Windows and floors before delivery of the object.
Interiors of the interior of the kindergarten.
View of new apartment buildings.
New residents bring furniture to the entrance.
View of the new house.
Children swing on the swings on the Playground.
Children's faces.
View of the Playground.
Children paint during a class at the kindergarten.
Calendar: 1979
Locations: Astrakhan region [769]
Seasons: Summer [824]