The construction of the complex of protective structures (GLC) of Leningrad from floods, the work schedule of an integrated team of SU-1 managing construction Lengidroenergospetsstroi (Lengas).
In the direction of Kronstadt go to the dump.
Panoramas of construction sites.
Reinforcing work and welding.
Fitters and concrete workers attach plate.
The pouring of concrete into the body of the culverts.
Disassembly of bottom jumper by claymores.
The pit is filled with water.
Calendar: 1984
Locations: Leningrad [848]
Seasons: Autumn [826]