The construction of the Magnitogorsk metallurgical combine in the years 1929-1930.
The construction of the railway for the transport of building materials.
Concrete work on the construction.
The feet of the workers, seal the concrete.
The horse-drawn trolley carrying soil.
The types of under construction industrial enterprises.
The results of the first coke.
A steamboat carries a trolley with coke.
Trolley with coal in the mine.
The production process in the forge shop of a factory.
People go to the river Bank.
A river landscape.
People on the shore waiting for the opening of the dam.
Panorama of construction of industrial enterprises, the wooden frames of the shop buildings.
The types of the new tube plant in Mariupol.
The production process in the shop.
Cutting of finished pipes.
Finished pipe in the shop.
Production processes in the rolling mill.
Handling of hot workpieces in a rolling mill.
Production processes in the foundry.
The unit, made at the Leningrad plant "electric power".
Production processes in the shops of Izhorskiye Zavody plant, rolling mills.
Factory workers go to the celebration meeting.
The start of the electric unit.
Steelmakers face.
Production processes in the iron foundry in 1933.
Transparency, a report on the results of the first iron smelting.
Working-casters in the shop at the furnace.
The steam shovel loads the platform to the ground.
Calendar: 1929-1930 1933
Locations: Magnitogorsk [914] Leningrad region [785] Ukraine [229] USSR [863]
Seasons: Summer [824]