You found 84 newsreels for query "sleepers"
Annotation
Complex track machines used in replacement of sleepers.
... train.
Logging.
Softwood is used for sleepers in the subway.
Finished sleepers.
After drying, the sleepers are impregnated with a special composition.
Track measuring car.
The technical condition of the tracks is being recorded.
Areas where replacement of sleepers is necessary are identified.
On the subway ...
... subway, night windows are allocated to perform repair and track work.
A team for manual replacement of sleepers.
Before starting work, each employee must register in a special journal.
The station attendant informs the train dispatcher about the closure of the stage for work.
The power dispatcher removes ...
... work is protected by stop signals.
Manual replacement of sleepers sunk into the concrete base with the use of jackhammers.
The employee is wearing noise-absorbing headphones, respirators and anti-vibration gloves.
It is possible to replace one sleeper per shift with one employee
brigades.
At 4.40, a signal ...
... signal is being removed.
At 5.15, the power dispatcher turns on the voltage on the contact rail.
Design bureau.
The complex of machines for mechanized sleeper replacement was developed by the staff of the Central design bureau of heavy track machines of the Ministry of Heavy Engineering of the USSR.
Passengers ...
... a cutter and a trellis cutter on the platform towing a sleeper-extracting machine, milling and shpalokleevy.
During the work of the repair staff, the same safety rules are observed as during the work of the team for manual replacement of sleepers.
The mechanisms are powered by electrical panels available ...
... available in the tunnel.
Mechanism for cutting the middle part of the sleepers.
The device for dismantling the track fastener.
The work of the sleeper machine.
A cartoon explaining the operation of the mechanism.
Keywords
Replacement of sleepers.
Metro.
... machine for milling the sides and the base of the sleeper box.
The components of the machine.
The operator stops the car over the place of work.
The precise installation mechanism combines the body of the lifting and turning mechanism with the axis of the sleeper box.
Rail grapples are activated.
Milling.
The ...
...
In the same sequence, the nest is prepared in a concrete base on the other side of the path.
Sample of a sleeper socket.
Drawing of a nest for laying sleepers.
Cutting mechanism.
If the sleeper replacement sites are far from each other, the mechanisms are transported by an autoresin.
Shpalokleevaya ...
... shaker lift the rail to a height slightly greater than the thickness of the sleeper.
Glue plates are placed on the bottom of the sleeper box.
The shpalokleevy machine returns to the place of work.
The gap between the sleeper and the track concrete is filled with cement mortar.
The composition is taken ...
...
Keywords
Mechanized replacement of sleepers.
... the sleepers.
Turtle crawls through the tie.
Workers hammer crutches for mounting rails.
Laying rails manually.
Type of connecting parts of the rails.
Work nut screwed at the joints.
Construction of the railway track laying of the Northern town.
Workers laying Southern town clog crutches sleepers.
Northern ...
... layout of the sleepers."
People unload sleepers from the cart.
Laying sleepers on the railway embankment.
The plate with the inscription "Stretch."
Working align the distance between the sleepers.
The plate on the car says "Kostylschiki."
Workers hammer crutches for fixing rails to the sleepers.
Chief town ...
...
... Working up the ladder into the car club.
People play in the club of checkers.
Wall newspaper Northern laying town.
People play checkers sitting on the sleepers.
View of the railway track on a background of notes in the wall newspaper.
People loaded into carts during the laying of the stone path.
Removal of ...
... embankment.
Transportation sleepers on carts.
Laying sleepers on the mound.
The construction of the railway.
Workers laying Southern town laid rails on sleepers.
Engineers measure the distance between the rails.
Head gives instructions to the workers.
Workers laid rails on sleepers.
Installation of fasteners ...
...
Laying sleepers in stacks.
Workers laid new sleepers on the mound.
Passing truck with rails drawn by donkeys.
Loading rails on the cart.
Laying rails on the sleepers.
Excavator absorbs the ground and falls asleep in his trolley truck convoys in the construction of Chelyabinsk-Petropavlovsk.
Working excavator ...
... into the formwork solution, bring skeletons out of the valve.
View of the bridge under construction.
In the unfinished bridge passes a train.
New sleepers laid on the mound.
Meeting of the operational headquarters.
Commercial composition with wood.
Rails and sleepers for track repair.
Repair of tracks.
Laying rails.
Repair of track machines and mechanisms in the workshop.
Laying of a rail whip using a machine for heating rails designed by engineer Zubov.
Schemes of repair ...
... repair work (animation).
The unit for cutting rails is in operation.
A line for disassembling the old rail-sleeper grid.
Rail-sleeper grid assembly line.
Repair of the contact network.
... Humidification of the upper layer of the ballast prism.
Removal of excess ballast from the slope.
Disassembly of the rail-sleeper grid.
Loading of cut ballast into wagons.
Laying of a new rail-sleeper grid.
Installation of rail connectors.
A train is moving along an open stretch.
Summing up at headquarters.
Commodity ...
Mechanisms attachment.
Rails.
Sleepers.
Close-up.
Rails, sleepers, powdered with snow.
...
... signed a contract for competition, the face of Aksamentova.
Yegorov signed a contract.
Team members Rahmetova lay sleepers.
Sleepers laid on the embankment.
Working nailed the rails to the sleepers, the faces of the workers, a General view of the construction of the railway track.
...
... dispatcher on duty at work.
Unloading dumpcars.
Empty dumpcars are covered with a special liquid.
Formation of dumps.
Installation of rail-sleeper grilles.
Filling of sleeper boxes.
Grounding of all installations in the quarry.
Drainage and drainage systems.
Wells with submersible pumps to drain excess water ...
...
... main tracks with a high-speed track measuring car.
Production of anti-theft from rails unsuitable for laying.
Sleepers removed during major repairs.
The line for the restoration of sleepers.
Repair of crosspieces in the intervals between the passage of trains.
Description
workers railwaymen railway Tyumen-Surgut-Nizhnevartovsk: swim in the lake, go through the woods, riding on the trolley, straightens curves rails, clog sleeper, tamped earth electric drill.
Lunch workers.
Landscape.
Birches.
Lakes.
There is freight train.
...
... Lower landing timber industry.
Employee saws a log with a chainsaw.
The logs on the conveyor.
Sawmill.
Manufacturer of sleeper cutting.
Stack to the sleepers.
The marking of the sleepers.
Manufacture boards from deadwood.
Work on the sawmill.
Sawing slabs.
Machine, shavings of deadwood.
Compaction of chips ...
...